Putting the house back together

Water damage reconstruction for Los Angeles homes

Drying ends with open walls and missing flooring. Reconstruction puts it back, matched to what was there, from the same scope your insurer approved.

  • Answered 24/7
  • Drywall, flooring, cabinets
  • Matched to the original

Updated September 2026

24/7 emergency line

(323) 709-0141
  1. 1
    Drying confirmedReadings at dry first.
  2. 2
    Scope agreedLine by line, with photos.
  3. 3
    We rebuildDrywall to final paint.

Quick answer

Water damage reconstruction in Los Angeles begins only after readings confirm the structure is dry. We rebuild what mitigation removed, including drywall, insulation, flooring, cabinets, trim and paint, matching the original materials and following the same line-item scope used for your insurance claim, so there is no gap between the dry-out and the repair.

The job

Why the same company should dry and rebuild

When one crew does the dry-out and another does the repair, the second crew often re-scopes the job and the claim stalls. Our moisture logs and photos carry straight into the rebuild scope.

Nothing is closed up until the framing and subfloor read dry.

Kitchen base cabinets removed down to studs after a water loss

Cost factors

What water damage reconstruction costs

2026 guides put rebuild work such as drywall, flooring and trim at $20 to $37 per square foot; hardwood repair at $10 to $15 per square foot and plaster repair at $6 to $19. Planning ranges only.

Materials removed

What mitigation took out.

Finish level

Matching existing finishes.

Discontinued items

Tile or flooring no longer made.

Cabinets

Base only versus the full run.

Paint scope

Patch, wall or whole room.

Permits

When the work requires them.

Your options

Match it or replace the whole area?

When the original is gone, these are the usual choices.

Matching versus replacing
ItemMatch in placeReplace the whole area
HardwoodIf boards are still madeIf no match exists
TileIf spares or stock existOften the whole floor or wall
CabinetsIf door style is still madeFull run if not
Texture and paintUsuallyWhole wall for even color
TrimProfile matched or milledRarely needed

Variations of this job

Flooring replacement

Flooring replacement covers what could not be saved: carpet, pad, laminate that swelled, vinyl that lifted, or hardwood that buckled past repair. Where the original product is still made, we match it. Where it is not, we lay new flooring across the whole continuous area so there is no visible seam between old and new, which is how most policies handle matching. Subfloor gets checked and replaced where it delaminated or stayed soft after drying, so the new floor does not squeak or dip.

Carpenter installing new baseboard in a Los Angeles living room

Cabinet and vanity replacement

Cabinet and vanity replacement is needed when particle board bases swelled from a leak under a sink or dishwasher. Swollen particle board does not shrink back. Sometimes only the base or toe kick is replaced; other times the full run, if the boxes delaminated or the finish cannot be matched. We measure before demolition, protect countertops when they can be reused, and set new boxes level so the top sits flat again. Plumbing is reconnected and checked for leaks before we leave.

Trim and paint

Trim and paint are the last step and the one people notice most. Baseboard, casing and door trim removed during drying go back where they can, or are matched in profile when they cannot. Walls are primed and painted, usually the full wall rather than just the patch, so the color reads even in daylight. Older homes often have trim profiles no longer stocked, and we can have them matched from a sample. Caulk and touch-up are the final pass.

Los Angeles conditions

Matching materials in older houses

Across Los Angeles County, more than half the homes were built before 1970, and in Burbank the median house dates to 1952. Rebuilds in houses that age mean matching things that are no longer stocked: plaster walls, old trim profiles, narrow oak strip floors and discontinued tile. We plan for that before demolition, photographing profiles and saving samples so the finished room reads as original.

Time

How long a rebuild takes

Drywall and paint for one room usually take a few days. Flooring and cabinets depend on materials, and special orders can take weeks, so we order early.

How the job runs

From dry to finished

WetDry and signed off

  1. 1

    Confirm dry

    Final readings on framing and subfloor.

  2. 2

    Agree the scope

    Line items matched to the claim.

  3. 3

    Order materials

    Matched flooring, cabinets and trim.

  4. 4

    Insulation and drywall

    Hung, taped and textured.

  5. 5

    Cabinets and flooring

    Set level, laid continuously.

  6. 6

    Trim and paint

    Profiles matched, walls painted.

  7. 7

    Walkthrough

    Punch list checked with you.

FAQ

Reconstruction questions

Related work

Other restoration jobs worth knowing about

House dried out and waiting on repairs?

Call and we will walk the rooms and plan the rebuild with you.